Molybdenum composite hybrid laminates and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9862175
SERIAL NO

14795209

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a molybdenum composite hybrid laminate is disclosed. The method includes treating a surface of each of a plurality of molybdenum foil layers. The method further includes interweaving the surface treated molybdenum foil layers with a plurality of composite material layers. The method further includes bonding with an adhesive layer each of the surface treated molybdenum foil layers to adjacent composite material layers to form a molybdenum composite hybrid laminate having improved yield strength.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY100 N RIVERSIDE PLAZA CHICAGO IL 60606-1596

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Robert A Federal Way, US 45 1380
Blohowiak, Kay Y Issaquah, US 46 871
Bossi, Richard H Renton, US 50 706
Butler, Geoffrey A Seattle, US 12 126
Carlsen, Robert L Kent, US 4 69
Foltz, Gregory Alan Seattle, US 3 36
Gardner, John Mark Newcastle, US 3 65
Landmann, Alan E Woodinville, US 6 34
Matsen, Marc R Seattle, US 158 2870
Moore, Stephen G Renton, US 21 339
Negley, Mark A Bellevue, US 29 301
Piehl, Marc J Renton, US 32 425
Pingree, Liam S Cavanaugh Seattle, US 6 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00