Method for transferring carbon nanotube array and method for forming carbon nanotube structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9862170
SERIAL NO

14524789

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for transferring a carbon nanotube array is disclosed. The carbon nanotube array has an ability to have a carbon nanotube structure drawn therefrom. The carbon nanotube array is transferred from a growing substrate to a substitute substrate, meanwhile the carbon nanotube array is still having the ability to have a carbon nanotube structure drawn from the substitute substrate. The substitute substrate is placed on the top surface of the carbon nanotube array. An adhesive layer is sandwiched between the substitute substrate and the carbon nanotube array. The substitute substrate is separated from the growing substrate, thereby separating the bottom surface of the carbon nanotube array from the growing substrate. A method for making a carbon nanotube structure is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HON HAI PRECISION INDUSTRY CO LTDNO 66 JHONGSHAN RD TUCHENG DIST NEW TAIPEI CITY 236038
TSINGHUA UNIVERSITY100084 NO 1 TSINGHUA YUAN BEIJING HAIDIAN DISTRICT BEIJING CITY BEIJING CITY 100084

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fan, Shou-Shan Beijing, CN 1514 11778
Wei, Yang Beijing, CN 346 1584

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00