Subsea electrical architectures
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jan 2, 2018
Issued Date -
N/A
app pub date -
May 31, 2012
filing date -
Jun 1, 2011
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
The subject-matter of the present invention concerns an electrical architecture for power distribution to subsea equipment comprising at least one variable speed drive, VSD, module, wherein said at least one VSD module comprises at least one self commutated line side converter including power semiconductor.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
TOTALENERGIES ONETECH | 92400 COURBEVOIE |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Baerd, Henri | Massy, FR | 10 | 43 |
# of filed Patents : 10 Total Citations : 43 | |||
Thibaut, Edouard | Pau, FR | 1 | 8 |
# of filed Patents : 1 Total Citations : 8 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 2 Citation Count
- H02J Class
- 22.71 % this patent is cited more than
- 7 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jul 2, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 2, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Matter Detail

Renewals Detail
