Station-building power supply device and method of controlling the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859715
SERIAL NO

14423829

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A station-building power supply device is provided in each station building and supplies low-voltage AC power to station building facilities of each station building. There are two mode therein: a regenerative mode in which, when regenerative power regenerated by a train to an overhead wire becomes surplus, the surplus regenerative power supplied from the overhead wire and power supplied from a high-voltage distribution line are used together to supply low-voltage AC power corresponding to an amount of normal power consumption of the station building; and a standby power supply mode in which, when a power outage of the high-voltage distribution line occurs, power supplied from the overhead wire is used to supply low-voltage AC power corresponding to an amount of emergency power of the station building.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310 ?1008310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishikura, Syuji Tokyo, JP 2 11
Matsumura, Yasushi Tokyo, JP 80 673
Okuda, Wataru Tokyo, JP 4 7
Tanaka, Takeshi Tokyo, JP 347 3882

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00