Electric load center

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859692
SERIAL NO

15402337

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical load center for residential and commercial buildings includes an enclosure, a cover assembly, and a panelboard. The panelboard includes an insulated base, first and second bus bars, each of the first and second bus bars having an elongated main member, a plurality of connecting members, each of which is integrally formed from an edge of the main member, and a plurality of conducting members integrally formed from each of the connecting members. The panelboard further includes at least one neutral bar. The neutral bar is preferably I-shaped and includes a generally vertical main body, and transverse upper and lower members. The transverse upper member is preferably thicker than the transverse lower member and includes an outward taper from a top surface to a bottom of the transverse upper member to provide a greater contact surface area.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB SCHWEIZ AGBRUGGERSTRASSE 66 5400 BADEN SWITZERLAND

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lalancette, Daniel Saint-Jean-sur-Richelieu, CA 53 524
Lefort, Maxime Longueuil, CA 9 4
Pelletier, Jean-Michel Lacolle, CA 8 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00