Conductive connection assembly, method for manufacturing the same and kit for a body comprising carbon fibre-reinforced material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859630
SERIAL NO

14371705

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a conductive connection assembly (5), a method for manufacturing the same and a kit for a body (23) comprising carbon fibre-reinforced material, e.g. for a vehicle comprising a carbon fibre-reinforced body (23), with an electrical structural network for conducting electric discharges. The conductive connection assembly (5) includes a conductive interconnection element (1) with a conductive braid material (B). Furthermore, a kit is provided, the kit including at least two conductive connection assemblies (5) that are provided with differently shaped interconnection elements (1). Finally, a method that comprises the step of reshaping longitudinal ends (3, 4) of a braid material (B) is provided according to the invention.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TYCO ELECTRONICS UK LTDWILTSHIRE WILTSHIRE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
MacNaughton, Roy Swindon, GB 11 127
Stubbs, Matthew Swindon, GB 5 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00