Method for producing an electrochemical bundle of a lithium battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859546
SERIAL NO

15025048

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing an electrochemical bundle of a lithium battery, such as an Li-ion battery, with a view to electrically connecting same to the output terminals of the battery, wherein it includes the combination of two steps of folding an electrochemical bundle of a lithium battery which are carried out separately, i.e. a radial folding with plastic deformation and an axial compacting, which make it possible to obtain two separate areas on at least one, and preferably both, of the lateral ends of the bundle. The invention also concerns a method for producing an electrical connection part between the electrochemical bundle and one of the output terminals of the battery, and an associated current collector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVESBAT LE PONANT 25 RUE LEBLANC 75015 PARIS 75015

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dewulf, Frédéric Voiron, FR 9 27
Jost, Pierre Saint-Pierre de Mesage, FR 13 78
Leys, Come-Emmanuel Grenoble, FR 4 14
Masson, Olivier Grenoble, FR 36 249

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00