Interconnection structure and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859159
SERIAL NO

14644197

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An interconnection structure and a manufacturing method thereof are provided. The interconnection structure includes a substrate, a conductive through via, a dielectric layer, and a conductive layer. The substrate has a first surface and a second surface opposite to each other. The conductive through via is disposed in the substrate and extended from the first surface beyond the second surface. The dielectric layer is disposed on the substrate, wherein the dielectric layer has an opening exposing a portion of the conductive through via. The top surface of the conductive through via protrudes from the bottom surface of the opening. The conductive layer is disposed in the opening and connected to the conductive through via.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIMICRON TECHNOLOGY CORPNO 179 SHANYING RD GUISHAN DIST TAOYUAN CITY 333

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yu-Hua Hsinchu, TW 80 525
Hu, Dyi-Chung Hsinchu County, TW 146 1379
Hung, Yin-Po Hsinchu County, TW 5 23
Tain, Ra-Min Hsinchu County, TW 95 646

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00