Forecasting solar power generation using real-time power data, weather data, and complexity-based similarity factors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9857778
SERIAL NO

15288707

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments are directed to a computer-implemented method, computer system, and computer program product of forecasting power generation. The method includes analyzing a set of historical power generation data. Thereafter a set of clusters is determined wherein each cluster of the set of clusters represents power generated during the time period. Then receiving actual power generation data for a portion of the time period. Thereafter, determining which cluster of the set of clusters contains historical power generation data that is most similar to the actual power generation data. Then forecasting power generation for a remainder of the time period, using the historical power generation data of the cluster.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Khabibrakhmanov, Ildar Syosset, US 12 170
Kumar, Tarun Mohegan Lake, US 93 676
Lavin, Mark A Katonah, US 88 3176
Zhang, Rui Ossining, US 806 5113

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00