Purification process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9856543
SERIAL NO

13814088

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for purifying Mo-99 from an acidic solution obtained by dissolving an irradiated solid target comprising uranium in an acidic medium, or from an acidic solution comprising uranium and which has previously been irradiated in a nuclear reactor, or from an acidic solution comprising uranium and which has been used as reactor fuel in a homogeneous reactor, the process comprising contacting the acidic solution with an adsorbent comprising a zirconium oxide, zirconium hydroxide, zirconium alkoxide, zirconium halide and/or zirconium oxide halide, and eluting the Mo-99 from the adsorbent using a solution of a strong base, the eluate then being subjected to a subsequent purification process involving an alkaline-based Mo-99 chromatographic recovery step on an anion exchange material. Also provided is apparatus for carrying out the process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MALLINCKRODT NUCLEAR MEDICINE LLC675 MCDONNELL BOULEVARD HAZELWOOD MO 63042

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barbosa, Luis A M M Alkmaar, NL 4 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00