Mixing and stirring device, method, and method for manufacturing lightweight gypsum board, including chute with eccentric orifice passage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9856168
SERIAL NO

14647230

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Turning motion of gypsum slurry spouting onto a sheet of paper for a gypsum board liner is restricted for preventing maldistribution, deviation or irregular dispersion from occurring in the density distribution of the slurry on the sheet of paper. A mixing and stirring device for gypsum slurry has a circular casing forming a mixing area, a rotary disc positioned in the casing, and a tubular passage for feeding the slurry onto the sheet of paper for the gypsum board liner. A chute has a fluid passage portion with its cross section being non-axisymmetric with respect to a center axis of the tubular passage, or a fluid passage portion varying a position of the center axis of the tubular passage by a change or lateralization of the cross section of fluid passage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YOSHINO GYPSUM CO LTDSHIN-TOKYO BLDG 3-1 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1000005 ?1000005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inenaga, Hitoshi Fukuoka, JP 1 20
Matsuzaki, Yutaka Sodegaura, JP 7 61
Ueno, Yasutoshi Toyohashi, JP 2 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00