CVT target engine speed control for coasting and retarding

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9855951
SERIAL NO

15349784

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A machine may include an engine, a traction device, a continuously variable transmission (CVT) connecting the engine to the traction device, an operator input device outputting engine output command signals input by an operator, an engine speed sensor monitoring an engine output speed, and an electronic control module (ECM). The ECM may control the engine to a non-retarding target engine speed when a commanded engine output is greater than zero, a retarding target engine speed when the commanded engine output is zero and a commanded brake force is greater than zero, and a coasting target engine speed when the commanded engine output is zero and the commanded brake force is zero. The ECM may use engine speed sensor signals as feedback, and determine a CVT transmission ratio that will cause the CVT to apply a load to the engine that will cause the engine to run at the specified target engine speed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CATERPILLAR INC100 NE ADAMS STREET PEORIA IL 61629

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lister, Brian Edwards, US 10 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00