Shaped product made of fiber-reinforced composite material and having excellent surface appearance

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9855689
SERIAL NO

14199015

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a shaped product made of a fiber-reinforced composite material including reinforcing fibers having an average length of 5 mm or more and 100 mm or less and a thermoplastic resin, in which a volume fraction of reinforcing fibers (Vf=100×volume of reinforcing fibers/(volume of reinforcing fibers+volume of thermoplastic resin)) is 5 to 80%, grains are formed on a surface of the shaped product, and a ratio of a reinforcing fiber bundle (A) including the reinforcing fibers of a critical number of single fiber or more, the critical number defined by Formula (1), to the total amount of the reinforcing fibers is 20 Vol % or more and 99 Vol % or less:

description='In-line Formulae' end='lead'Critical number of single fiber=600/D  (1)description='In-line Formulae' end='tail'

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEIJIN LIMITEDOSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arakawa, Motoomi Matsuyama, JP 24 291
Nagakura, Yasunori Matsuyama, JP 12 72
Sugiyama, Toru Matsuyama, JP 138 1630
Taniguchi, Michiharu Matsuyama, JP 7 83

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00