Functionalized metal oxide soldering methods and UV sensor manufactured thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9855618
SERIAL NO

14623155

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a method of soldering a functionalized metal oxide, and an electronic device manufactured thereby, and more particularly, a method of soldering a functionalized metal oxide which is capable of growing a solder structure by a hydrothermal synthesis method using a pulsed laser, and is usable in a UV sensor, and an electronic device manufactured thereby. According to the present invention, thermal diffusion generated from a laser is limited due to the use of a pulsed laser, and thus, nanosolder having high density and a shape to be precisely adjustable may be prepared by a hydrothermal synthesis method by the pulsed laser, thereby facilitating the joining of the nanostructure, and further, the nanosolder is formed between the nanostructures, thereby being usable as a metal oxide structure having functionality.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA ADVANCED INSTITUTE OF SCIENCE AND TECHNOLOGY291 DAEHAK-RO YUSEONG-GU DAEJEON 34141

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Kyunghan Daejeon, KR 2 5
Kwon, Kyungmook Daejeon, KR 2 4
Shim, Jaeho Daejeon, KR 3 2
Yu, Kyoungsik Daejeon, KR 16 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00