Hard coating film for cutting tools

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9855608
SERIAL NO

14915905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a hard coating film formed on a hard base material such as cemented carbide. The hard coating film has a nanoscale multilayered structure to have improved oxidation resistance and wear resistance. The hard coating film is a hard coating film formed on the base material. The first layer is composed of a TiAl nitride having a composition of Ti1-aAla (0.3≦a≦0.7), and the second layer has a nanoscale multilayered structure or a structure in which the nanoscale multilayered structure is repeatedly laminated at least two times, the nanoscale multilayered structure including a thin layer A composed of an AlTiSi nitride, a thin layer B, a thin layer C composed of a AlCr nitride, and a thin layer D having thicknesses of 3 nm to 20 nm. The thin film B and the thin film D are composed of a TiAl nitride.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KORLOY INCSEOUL SOUTH KEREAN SEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Seoun-Yong Chungcheongbuk-do, KR 1 12
Ahn, Seung-Su Chungcheongbuk-do, KR 15 32
Kim, Young Heum Chungcheongbuk-do, KR 57 497
Lee, Sung-Gu Chungcheongbuk-do, KR 16 47
Park, Je-Hun Chungcheongbuk-do, KR 14 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00