Equipment for inserting a joint prosthesis, in particular a knee prosthesis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9855061
SERIAL NO

14113092

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Equipment for inserting a joint prosthesis, in particular a femur component of a knee prosthesis, comprises a base frame having a guiding plate and a laterally protruding primary gage, a fastening device on the bone, and a curved milling gage having a main body and a guiding piece, which can be moved along a curved guiding path relative to the main body and has a receptacle for an abrasive tool. Furthermore, the equipment comprises an aligning device, which places the curved milling gage in a clearly defined relative position when the curved milling gage is inserted into the base frame. Due to the precise positioning in conjunction with the curved guiding path, the mounting seat can be prepared easily without damaging surrounding tissue. Thus, even large and complexly shaped prostheses, such as knee joint prosthesis, can be reproducibly inserted in an easy and safe manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DERU GMBH22844 NORDERSTEDT

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amos, Balzarini Norderstedt, DE 1 8
Dmuschewsky, Klaus Hamburg, DE 29 633
Iredi, Marco Norderstedt, DE 4 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00