Solar module frame

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9853598
SERIAL NO

14491166

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solar module frame includes two first borders and two second borders. At least one first border includes a first segment and a second segment, where one end of the first segment is connected to one end of the second border, and one end of the second segment is connected to one end of the other second border. The solar module frame includes at least one connection component. One end of the connection component is connected to the other end of the first segment, and the other end of the connection component is connected to the other end of the second segment. Each of the first segment, the second segment, and the connection component includes an external wall, a support wall, a first clamping wall, and a second clamping wall. Each of the first segment and the second segment includes an internal wall.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEO SOLAR POWER CORPNO 7 LI-HSIN RD 3 HSINCHU SCIENCE PARK HSINCHU

International Classification(s)

  • No Non-US Classification to display

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chien-Liang Hsinchu, TW 87 825
Chung, Chang-Kuei Hsinchu, TW 2 3
Hung, Sen-Hsiang Hsinchu, TW 1 3
Lin, Ching-Huang Hsinchu, TW 32 111
Lin, Hung-Yang Hsinchu, TW 3 4
Wu, Meng-Hsiu Hsinchu, TW 32 169

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • No Patent Citation Ranking to display

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00