Composition for forming secondary battery electrode, secondary battery electrode, and secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9853290
SERIAL NO

14125281

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention addresses the problem of providing an electrode-forming composition, which is used for the purpose of producing a secondary battery that has excellent charge and discharge cycle characteristics, and which exhibits excellent dispersibility of an active material and a conductive assistant. The problem is solved by a composition for forming a secondary battery electrode, which contains (A) an electrode active material and/or (B) a carbon material that serves as a conductive assistant, (C) an amphoteric resin-type dispersant that is obtained by neutralizing at least some carboxyl groups in a copolymer containing aromatic rings, carboxyl groups and amino groups with a basic compound, and (D) an aqueous liquid medium.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYO INK SC HOLDINGS CO LTD2-1 KYOBASHI 2-CHOME CHUO-KU TOKYO 1040031 ?1040031

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Moroishi, Yasuyuki Tokyo, JP 8 36
Sigemori, Kazunori Tokyo, JP 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00