Inverted metamorphic multijunction solar cell with surface passivation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9853180
SERIAL NO

13921756

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multijunction solar cell including an upper first solar subcell; a second solar subcell adjacent to the first solar subcell; a first graded interlayer adjacent to the second solar subcell; a third solar subcell adjacent to the first graded interlayer such that the third subcell is lattice mismatched with respect to the second subcell. A second graded interlayer is provided adjacent to the third solar subcell, and a lower fourth solar subcell is provided adjacent to the second graded interlayer, such that the fourth subcell is lattice mismatched with respect to the third subcell. An encapsulating layer composed of silicon nitride or titanium oxide disposed on the top surface of the solar cell, and an antireflection coating layer disposed over the encapsulating layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLAERO TECHNOLOGIES CORP10420 RESEARCH ROAD SE ALBUQUERQUE NM 87123

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cornfeld, Arthur Sandia Park, US 82 2152

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00