Conductive composition and solid electrolytic capacitor obtained using aforementioned composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9852825
SERIAL NO

14435088

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are: a conductive composition containing a conductive polymer (A) satisfying the below-mentioned condition (i), and a compound (B) having at least 3 hydroxyl groups, and having a pH at 25° C. of a 1 mol/L aqueous solution of no greater than 9.0; a conductive composition that further contains a water-soluble polymer (C) having a hydroxyl group; and a solid electrolytic capacitor having a solid electrolytic layer containing the composition. Condition (i): the volume-average particle size of the smallest particle distribution containing the smallest peak exhibited by the particle size among at least one peak obtained by measuring the particle distribution by means of a dynamic light scattering method using a conductive polymer solution containing 1% by mass of the conductive polymer being less than 26 nm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI CHEMICAL CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sakai, Takahiro Toyohashi, JP 117 633
Yamada, Kohei Yokohama, JP 139 520
Yamazaki, Akira Toyohashi, JP 205 3133

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00