Passive nuclear reactor cooling system using compressed gas energy and coolant storage outside nuclear plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9852819
SERIAL NO

14243302

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A passive safety system for a nuclear power plant (100) cools a nuclear power plant after shutdown (SCRAM) even when all primary water circulation has been disabled. The system comprises a source of compressed gas (112, 805) that can be its only source of operating energy, a source of water (106, 500), and a plurality of plumbing components. The system is located nearby but outside of the plant where it will not be damaged in the event of an accident inside the plant. In one embodiment, the system is located underground. In another embodiment, the system is portable so that the gas and water are carried in tanks (500, 510) on railroad cars or other wheeled conveyances. The portable system is located above ground, or optionally in a covered trench (705). In an alternative embodiment, only compressed gas is used to cool the plant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WATTENBURG WILLARD HARVEYCHICO CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wattenburg, Willard Harvey Chico, US 5 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00