Method for optimizing utilization of workload-consumed resources for time-inflexible workloads

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9852009
SERIAL NO

15149211

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods for optimizing utilization of workload-consumed resources for time-inflexible workloads are disclosed. By sorting workload-consumed resource profiles representing individual workloads in one system according to an order of standard deviation or descending volume, two workload-consumed resource profiles can be combined to check if combination criteria are fulfilled. If any combination satisfies the combination criteria, corresponding workloads can be combined to share the same resource from the system. Thus, optimizing utilization of the workload-consumed resource can be achieved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PROPHETSTOR DATA SERVICES INC13F NO 219 MINQUAN RD WEST DIST TAICHUNG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Wen Shyen Taichung, TW 19 168
Hsieh, Wen Chieh New Taipei, TW 5 6
Huang, Ming Jen Taichung, TW 12 130
Shih, Tsung Ming Tainan, TW 5 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00