Method for non-fluorescence higher harmonic generation ground state depletion super-resolution microscopy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9851545
SERIAL NO

14847538

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses a method for non-fluorescence higher harmonic generation ground state depletion super-resolution microscopy, it includes the following steps: providing an organic material unit, focusing excitation light and ground state depletion light, generating a higher harmonic signal, performing ground state depletion and performing microscopic imaging. With the implementation of the present invention, the stimulated electrons of the organic material remains majorly on the singlet (S1) state or the triplet (T1) state, instead of the ground (S0) state, to provide modulation of the spatial distribution of the non-fluorescence signal, and make STED microscopy applicable to non-fluorescence signals to promote the resolution of the images.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL CENTRAL UNIVERSITYNO 300 ZHONGDA RD ZHONGLI CITY TAOYUAN COUNTY 320

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Jui-Fen Taoyuan, TW 3 21
Chen, Szu-Yu Taoyuan, TW 23 82
Tai, Chao-Yi Taoyuan, TW 4 1
Wu, Hao-Hao Taoyuan, TW 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00