Boiler system and power plant including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9851101
SERIAL NO

15026452

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A boiler system is provided including: a boiler that burns fuel containing sulfur content, chlorine content, and water content to generate a combustion gas; a bagfilter that removes sulfur oxide; a denitration section that removes nitrogen oxide; a desulfurizing absorbent supply section that mixes a desulfurizing absorbent into the combustion gas on an upstream side of the bagfilter; and a reformer that mixes a denitrating reagent into the combustion gas on an upstream side of the denitration section, wherein the bagfilter performs dry desulfurization, and a temperature of the combustion gas passing through the bagfilter and flowing into the denitration section is higher than 200° C. and 350° C. or lower, and the combustion gas from which the sulfur oxide has been removed by the bagfilter flows into the denitration section without being heated on the upstream side of the denitration section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kiyosawa, Masashi Kanagawa, JP 39 149
Masuda, Tomotsugu Kanagawa, JP 11 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00