Capacity modulated scroll compressor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850903
SERIAL NO

14958524

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a compressor with an orbiting scroll member having a first end plate and a first spiral wrap. A non-orbiting scroll member has a second end plate and a second spiral wrap, the second spiral wrap forming a meshing engagement with the first spiral wrap to create a plurality of compression chambers between a suction port and a discharge port. A first port in communication with a first of the plurality of compression chambers selectively injects an injection fluid into the first of the plurality of compression chambers to increase a compressor capacity and selectively leaks a first compressed fluid from the first of the plurality of compression chambers to reduce the compressor capacity. A second port in communication with a second of the plurality of compression chambers selectively leaks a second compressed fluid from the second of the plurality of compression chambers to reduce a compressor capacity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EMERSON CLIMATE TECHNOLOGIES INC1675 W CAMPBELL ROAD SIDNEY OH 45365

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Perevozchikov, Michael M Tipp City, US 88 1366

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00