Control system for internal combustion engine and inert gas concentration detecting device for compressed natural gas

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850867
APP PUB NO 20140360471A1
SERIAL NO

14367620

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a control system that includes a pressure accumulating portion that supplies CNG to a fuel injection valve and a regulator that adjusts a pressure in the pressure accumulating portion to a set pressure and of which a valve element opens when CNG is supplied to the pressure accumulating portion and closes when supply of CNG to the pressure accumulating portion is shut off, a control parameter relating to a combustion state in an internal combustion engine is controlled on the basis of a length of a period during which an opening degree of the valve element reduces from a first predetermined opening degree to a second predetermined opening degree when the pressure in the pressure accumulating portion is adjusted to the set pressure by the regulator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571
AISAN KOGYO KABUSHIKI KAISHA1-1 KYOWA-CHO 1-CHOME OBU-SHI AICHI 4748588 ?4748588

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eto, Hiroshi Obu, JP 13 107
Masubuchi, Masahiko Mishima, JP 21 188
Sugiyama, Kouseki Shizuoka-ken, JP 21 215
Taniguchi, Satoshi Numazu, JP 73 1012

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00