Power system with internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850856
SERIAL NO

15622691

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power system including a variable volume combustion chamber for a two-stroke engine having a controlled exhaust port, a fuel injector to the combustion chamber and an oxygen injector to the combustion chamber. The oxygen injector provides repeated oxygen injection pulses to complete a charge. The controlled exhaust port includes an oscillating rotatably mounted valve. A source of pressurized concentrated oxygen to the oxygen injector is in a closed case having a ceramic fiber membrane. An air inlet and a waste outlet are in communication with a first side of the ceramic fiber membrane. An oxygen outlet is in communication with a second side of the ceramic fiber Ionic transport membrane. The case has a heat transfer surface in communication with the controlled exhaust port from the combustion chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEXT GENERATION ENGINES LLC5620 QUEENS KEW BONITA SPRINGS FL 34134

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McCrickard, Edmond Eugene Franklin, US 3 19
Roberts,, III Thomas Lee Ventura, US 2 4
Turner,, Jr Alfred A Bonita Springs, US 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00