Production risers having rigid inserts and systems and methods for using

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850719
SERIAL NO

15495012

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus enables modifying a riser's operating parameters for transporting production fluids from a subsea well to an offshore production facility after an initial period of production to address changes over time in the conditions of the reservoir and/or the riser without removing the original riser. An insert riser having a smaller diameter is inserted into the riser after the initial period. The original riser has a recessed seal face for receiving seal element(s) and a recessed lock groove for receiving a locking ring. An intervention coiled tubing having a sleeve removal tool is inserted into the riser to engage a protective sleeve covering the recessed seal face. The tubing is pulled to the floating structure thereby removing the protective sleeve and the temporary retaining ring from the production riser, exposing the recessed seal face. The insert riser can then be inserted into the riser and locked into place.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEVRON U S A INCP O BOX 6006 SAN RAMON CA 94583-0806

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ferrier, Brian Houston, US 1 1
Mazaheri, Alireza Cottesloe, AU 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00