System and method for modular data center

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850655
SERIAL NO

15002661

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular data center system is disclosed for constructing a modular data center building. A plurality of structural support columns are used to support a plurality of unit structures above a floor surface at a desired height relative to the floor surface. A pair of elongated support rails are also included which are coupled perpendicularly to the plurality of structural support columns, at approximately the desired height, to form two parallel, horizontally spaced apart tracks. Each of the unit structures includes a plurality of carriage assemblies, with each of the carriage assemblies including a wheel. The wheels allow the unit structures to be rolled horizontally into a desired position on the pair of elongated support rails when constructing the modular data center building to expedite its assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERTIV CORPORATION505 N CLEVELAND AVENUE WESTERVILLE OH 43082

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Crnogorac, Mislav Zagreb, HR 1 10
Matorić, Ivan Zagreb, HR 1 6
Ran{hacek, over (c)}ić Denis Samobor, HR 2 6
Uzelac, Goran Velika Gorica, HR 1 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00