Systems and methods for determining radiation dose in computed tomography scans

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9848846
SERIAL NO

14910314

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are described for determining a minimum radiation dose for a computed tomography (CT) scanning device. The method includes receiving a first input indicative of a selected minimum detectable contrast and a second input indicative of an estimate of a size of a subject to be exposed to the radiation dose. A minimum radiation dose to be applied via a radiation source is determined. The minimum radiation dose is determined at least in part by a power law model relating the size of the subject, a lesion size, and a minimum detectable contrast. The power law model is defined as MDC=A(L) dB(L) DoseC(L), wherein (i) MDC is the selected minimum detectable contrast, (ii) d is lesion size, (iii) Dose is radiation dose, (iv) A(L), B(L), and C(L) are pre-determined fitted parameters, and (v) L is the estimate of the size of the subject.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CEDARS-SINAI MEDICAL CENTER8700 BEVERLY BOULEVARD LOS ANGELES CA 90048

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhou, Yifang Irvine, US 4 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00