System and method for continuous measurement of transit latency in individual data switches and multi-device topologies

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9847922
SERIAL NO

14662055

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system, method, and associated apparatus for continuous measurement of transit latency in individual data switches and multi-device topologies is disclosed, which enables an accurate measure of real-word latency on production networks by applying a time stamp to production network data on ingress to a network element and determining a traversal time by capturing the time stamp on egress from the network element. In one embodiment, time stamps applied to network data are removed on egress to avoid undesirable packet growth across multiple hops of the network. Timing information on data flow through the data/forwarding plane of each network node of a production network can be gathered without the use of test harnesses, injected network data, or dedicated ports.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARISTA NETWORKS INC5453 GREAT AMERICA PARKWAY SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chandra, Subhachandra Santa Clara, US 2 45
Peach, John Maidenhead, GB 8 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00