Half-bridge resonant bidirectional DC-DC converter circuit having a half-bridge buck-boost converter and a resonant DC-DC converter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9847727
SERIAL NO

15364133

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A half-bridge resonant bidirectional DC-DC converter circuit comprising a half-bridge buck-boost converter and a resonant DC-DC converter. The half-bridge buck-boost converter is coupled to an external DC power source to achieve a wide input voltage range. The resonant DC-DC converter is coupled to the half-bridge buck-boost converter to act as a later stage circuit of the half-bridge buck-boost converter. The resonant DC-DC converter is used to control the direction of the bidirectional power flow and respond to the half-bridge buck-boost converter under a fixed frequency mode to convert the input of the half-bridge buck-boost converter to an induced current.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL CHUNG SHAN INSTITUTE OF SCIENCE AND TECHNOLOGYNO 481 CHIA AN SEC CHUNG CHENG RD LONGTAN DIST TAOYUAN CITY 325

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Kun-Feng Taoyuan, TW 33 163
Chiang, Hsuang-Chang Miaoli County, TW 21 78
Ho, Chin-Yu Taoyuan, TW 3 2
Wang, Rong-Yang Taoyuan, TW 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00