Charge pump-based split-rail supply generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9847713
SERIAL NO

15070508

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A charge pump circuit having first and second input nodes to be coupled to a first power source, and top and bottom output nodes and an intermediate node. The charge pump circuit produces i) a voltage at the top output node that is higher than a voltage of the intermediate node, and ii) a voltage at the bottom output node that is lower than the voltage of the intermediate node. A bias voltage source has i) an input that is to be coupled to a second power source and ii) an output that produces an output voltage, which is a predetermined proportion of an input voltage at the input and that follows the input voltage downward and upward as the input voltage sags and recovers, respectively. The output of the bias voltage source is directly connected to the intermediate node of the output stage. Other embodiments are also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APPLE INCONE APPLE PARK WAY CUPERTINO CA 95014

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Breece,, III David C Palo Alto, US 11 45
Hogan, Roderick B San Francisco, US 23 276
Johanningsmeier, Nathan A San Jose, US 19 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00