System and method for managing AC power using auxiliary DC-to-AC inversion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9847643
SERIAL NO

14446092

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method are provided for managing demand for a client with a fluctuating AC power grid demand, using DC-to-AC power inversion as an auxiliary source of power. The inverter has a selectable inversion power output levels connected to the AC client to supply auxiliary power for a portion of the AC power demand. The AC grid demand is averaged. In each of a series of periodic time intervals, a current AC grid demand average in a current time interval is compared to a demand goal, which is the highest AC grid demand average, as measured at an end of a time interval, and selected from a plurality of time intervals. The inverter output power level is selected so that the current AC grid demand average is less than or equal to the demand goal by the end of the current time interval.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANTENERGY INC9920 JEFFERSON BLVD CULVER CITY CA 90232

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Park, Daniel Beaverton, US 21 252

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00