Electrical receptacle connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9847595
SERIAL NO

15389923

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical receptacle connector includes a metallic shell, an insulated housing, first receptacle terminals, second receptacle terminals, first glue recess, and a first texture region. The metallic shell circularly encloses the insulated housing. The first and second receptacle terminals are held in the insulated housing. The first texture region is annularly formed on an inner wall of the metallic shell and corresponds to a periphery of the outer wall of the insulated housing. Therefore, the sealing member can attach onto the first texture region efficiently. Therefore, the sealing member does not overflow to the front portion of the receptacle cavity, and the inner gap can be sealed by the sealing member properly. Hence, the first texture region allows the sealing member to attach onto the inner wall of the shell body, and the sealing member can cover the inner gap completely to provide a reliable waterproof performance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADVANCED-CONNECTEK INCNO 2 ALLEY 9 LANE 45 PAO-HSIN RD HSIN-TIEN NEW TAIPEI CITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Long-Fei New Taipei, TW 42 506
Hou, Pin-Yuan New Taipei, TW 122 1678
Liao, Chung-Fu New Taipei, TW 63 967
Su, Rui New Taipei, TW 35 267
Tsai, Yu-Lun New Taipei, TW 110 1292
Wong, Yun-Jhong New Taipei, TW 5 34
Xiang, Dong New Taipei, TW 72 753

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00