Connecting pole for a rechargeable battery and rechargeable battery housing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9847522
SERIAL NO

13583192

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connecting pole for a rechargeable battery is disclosed. The connecting pole (1) has a connecting section (2) in which a pole terminal can be attached to the connecting pole (1). The connecting pole (1) has an attachment section (3) in which the connecting pole (1) can be attached in a housing part (5) of the battery. The attachment section (3) has a labyrinth section (4). The outer wall (6) of the connecting pole (1) has at least one circumferential projection (7, 8) in the labyrinth section (4). The circumference of outer wall (6) of the connecting pole (1) increases in the direction pointing away from the connecting section (2) in a section of the labyrinth section (4) which is not provided with a circumferential projection (7, 8). Also disclosed is a rechargeable battery housing or a part of said rechargeable battery housing having at least one connecting pole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CLARIOS GERMANY GMBH & CO KGAM LEINEUFER 51 HANNOVER 30419

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ledoux, Anne-Laure Langenhagen, DE 10 17
Streuer, Peter Hannover, DE 32 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00