Diffraction-based overlay marks and methods of overlay measurement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9846359
SERIAL NO

15392297

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method may include forming a first grating and a second grating, disposed in a region of vertical overlap of the first and second gratings on different levels, respectively, having substantially the same pitch, and inclined with respect to each other, such that a bias value between the first and second gratings is changed along a length direction of the first and second gratings, using a lithography process. A method may include emitting a beam to the first and second gratings; and obtaining trend information associated with a diffracted beam from an image pattern of a beam from the first and second gratings, using the emitted beam, in which the trend information may concern changes in the intensity of the diffracted beam according to the bias value. An overlay error in at least one grating may be determined based on the trend information and an intensity of a diffracted beam.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Jeong Jin Hwaseong-si, KR 11 60
Lee, Seung Yoon Seoul, KR 42 95
Oh, Seung Hwa Hwaseong-si, KR 1 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00