Battery state estimation device and storage battery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9846200
SERIAL NO

14428665

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

After charging or discharging is stopped, a reference timing (t0) is set, and a first timing (t1) at which battery voltage (V) changes by a unit amount (N) with respect to the reference timing (t0), and a second timing (t2) at which the battery voltage changes by twice more than the unit amount with respect to the reference timing (t0) are select and set. The ratio of the time difference (t2−t1) between the first and the second timing to the time difference (t1−t0) between the reference and the first timing is found as a voltage change parameter (R) corresponding to the rate of change of the change speed of the voltage battery. An estimation device considers the change rate determined by the parameter is considered to be unchanged during an electrical current non-passage, and estimates a stable open circuit voltage at an object timing in future after the second timing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC ENERGY CO LTD1-1 MATSUSHITA-CHO MORIGUCHI-SHI OSAKA 570-8511

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishii, Yohei Osaka, JP 36 536
Migita, Naoto Osaka, JP 2 24
Yamada, Akihiko Osaka, JP 32 511

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00