Connection systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9845785
SERIAL NO

14404817

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connection system for connecting a first connection point with a second connection point, the second connection point being arranged for rotation and translation with respect to the first connection point, the connection system includes a first connection point, a first support surface moveable linearly with respect to the first connection point, a second support surface moveable linearly and rotationally with respect to the first connection point, and a second connection point moveable linearly and rotationally with respect to the first connection point, moveable rotationally with respect to the first support surface, and fixed with respect to the second support surface, and a reverse bend radius cable chain located on the first and second support surfaces, and having a first end connected with the first connection point via a first connector cable, and a second end connected with the second connection point via a second connector cable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE ENERGY (UK) LIMITED3RD FLOOR 1 ASHLEY ROAD ALTRINCHAM CHESHIRE WA14 2DT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Germain, Christopher Bristol, GB 4 5
Goss, Richard Totnes, GB 2 3
Haworth, Daniel Cambridge, GB 3 8
Vigars, Paul Bristol, GB 13 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00