Method of determining the timing and quantity of fuel injection to operate an internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9845736
SERIAL NO

15004408

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of determining the timing and quantity of fuel injection to operate an internal combustion engine is disclosed. While operating the fuel injector to perform a fuel injection; a signal of a fuel pressure within the fuel rail during the fuel injection is sampled. The signal is used to determine first and second integral transforms yielding as output a value of first and second functions having as variables the fuel rail pressure drop caused by the fuel injection and the timing parameter indicative of the instant when the fuel injection started. Values of the first and second functions are used to calculate a value of the fuel rail pressure drop caused by the fuel injection and a value of the timing parameter. A value of a fuel quantity injected by the fuel injection is calculated as a function of the value of the fuel rail pressure drop.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mollar, Andrea La Loggia, IT 6 16
Nieddu, Stefano Turin, IT 19 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00