Method for producing anti-blocking hard coat film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9845393
SERIAL NO

14902832

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of invention provide a method for producing a hard coat film which has a hard coat that is formed from an active energy ray-curable resin composition on at least one surface of a film base. According to at least one embodiment, the active energy ray-curable resin composition used in this method contains (P) 100 parts by mass of a urethane (meth)acrylate compound, (Q) 0.02-5 parts by mass of organic fine particles having an average particle diameter of 10-300 nm, and (R) 0.0002-2 parts by mass of an acrylic silicone-based leveling agent. The method according to at least one embodiment includes the steps of (1) forming a wet coating film by applying the active energy ray-curable resin composition to the film base, (2) forming a dry coating film by drying the wet coating film, and (3) forming a hard coat film by curing the dry coating film by means of active energy ray irradiation at a temperature of 50-90° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RIKEN TECHNOS CORPORATIONTOKYO 101-8336

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tanabe, Ryoichi Tokyo, JP 4 13
Washio, Nozomu Tokyo, JP 19 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00