Closure assembly for squeeze bottle comprising a thermoplastic valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9845180
APP PUB NO 20160001936A1
SERIAL NO

14765153

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A closure assembly includes a valve for containing a substance in a squeeze bottle, a multi-layer material for providing a valve for such a closure assembly, a method for providing such a multi-layer material and a method for providing such a closure assembly. The closure assembly includes a closure cap with a cap part and a body part, a valve arranged in the body part of the closure cap, and an induction element. The induction element is arranged in the closure cap body part for induction sealing a loop shaped peripheral section of the valve to a loop shaped attachment surface of the closure cap body part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PLASTICUM NETHERLANDS B V9 ZEVENHEUVELENWEG TILBURG 5048 AN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Den, Boer Sebastiaan Wilhelmus Josephus Twello, NL 22 205
Ellenkamp-Van, Olst Lenny Marita Doetinchem, NL 12 68
Pun, Shi Ming Arnhem, NL 5 113
Ramon, Willem Woerden, NL 12 48
Rap, Albertus Ede, NL 3 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00