Polylactic acid formed body having a vapor-deposited film and method of producing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9845175
SERIAL NO

14382845

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polylactic acid formed body including a polylactic acid base material (1) and a hydrocarbon film (3) vapor-deposited on the surface of the base material by a plasma CVD method. The polylactic acid base material (1) exhibits a sharp X-ray diffraction peak in which a half-width of peak appearing in the 10°-25° wide angle X-ray measurement is not more than 1.22°, and the hydrocarbon film (3) is vapor-deposited on the surface of the polylactic acid base material (1), and includes two layers of a high CH2 layer (3a) having a ratio of CH2 per the total of CH, CH2 and CH3 of not less than 40% and a low CH2 layer (3b) formed on the high CH2 layer (3a) and having a ratio of CH2 per the total of CH, CH2 and CH3 of not more than 35%.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYO SEIKAN GROUP HOLDINGS LTD18-1 HIGASHI-GOTANDA 2-CHOME SHINAGAWA-KU TOKYO 1418627 ?1418627

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Takuro Yokohama, JP 25 317
Kito, Satoru Yokohama, JP 7 5
Ozawa, Satomi Yokohama, JP 5 6
Yamazaki, Kazuhiko Yokohama, JP 91 982

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00