Method and system for solid object manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9844916
SERIAL NO

14710023

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid object manufacturing system comprises: a controlling device, a solid object manufacturing device and a projecting device. The control device generates a solid object model and then divides the model into a plurality of layer images. The control device then adjusts the height of a lifting table of the solid object manufacturing device and controls the projecting device to project one of the layer images on the lifting table synchronously, so as to guide user to form an article by using a printing module of the solid object manufacturing device. The solid object manufacturing system guides user to complete the article by projecting the layer images and adjusting the height of the lifting table.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INVENTEC APPLIANCES CORPNO 37 WUGONG 5TH RD WUGU TOWNSHIP TAIPEI COUNTY 248
INVENTEC APPLIANCES (SHANGHAI) CO LTDNO 789 PU XING ROAD SHANGHAI
INVENTEC APPLIANCES (PUDONG) CORPORATIONNO 789 PUXING RD MINHANG DISTRICT SHANGHAI 201114

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Li Shanghai, CN 1435 18853
Tsai, Shih-Kuang Shanghai, CN 73 389
Yu, Li Shanghai, CN 175 2882

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00