Handle for a tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9844899
SERIAL NO

14168600

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing molded products having portions formed with two separate materials is provided. The process involves forming a first component over a structural core in a first step, and forming a second component that is secured to the first component and the core in a second step. The second component can be formed directly over the first component or can be secured thereto after formation. The first and second components can additionally be formed with indicia thereon, or with recesses within which inserts containing the desired indicia can be positioned. Additionally, the first component can be formed with a ridge disposed on a projection formed on the first component that effectively seals off a portion of the first component when the second component is formed around the core and the first component to ensure the portion of the first component surrounded by the ridge remains visible after formation of the second component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GAUTHIER BIOMEDICAL INCGRAFTON WI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gauthier, Michael T Grafton, US 54 747
Landowski, Steven S Random Lake, US 8 199

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00