Magnesium-based methods, systems, and devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9843080
SERIAL NO

14685428

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aspect of the present invention is an electrical device, where the device includes a current collector and a porous active layer electrically connected to the current collector to form an electrode. The porous active layer includes MgBx particles, where x≧1, mixed with a conductive additive and a binder additive to form empty interstitial spaces between the MgBx particles, the conductive additive, and the binder additive. The MgBx particles include a plurality of boron sheets of boron atoms covalently bound together, with a plurality of magnesium atoms reversibly intercalated between the boron sheets and ionically bound to the boron atoms.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALLIANCE FOR SUSTAINABLE ENERGY LLCC/O NATIONAL RENEWABLE ENERGY LABORATORY 15013 DENVER WEST PARKWAY GOLDEN CO 80401

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ban, Chunmei Golden, US 13 103
Parilla, Philip A Lakewood, US 5 24
Ruddy, Daniel Lafayette, US 8 6
Son, Seoung-Bum Golden, US 6 13
Zhao, Yufeng Golden, US 24 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00