III-nitride transistor including a p-type depleting layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9842922
SERIAL NO

15227240

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transistor includes a III-N layer structure comprising a III-N channel layer between a III-N barrier layer and a p-type III-N layer. The transistor further includes a source, a drain, and a gate between the source and the drain, the gate being over the III-N layer structure. The p-type III-N layer includes a first portion that is at least partially in a device access region between the gate and the drain, and the first portion of the p-type III-N layer is electrically connected to the source and electrically isolated from the drain. When the transistor is biased in the off state, the p-type layer can cause channel charge in the device access region to deplete as the drain voltage increases, thereby leading to higher breakdown voltages.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRANSPHORM TECHNOLOGY INC115 CASTILLIAN DRIVE GOLETA CA 93117

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chowdhury, Srabanti Goleta, US 34 675
Keller, Stacia Santa Barbara, US 45 1439
Lal, Rakesh K Isla Vista, US 29 985
Mishra, Umesh Montecito, US 97 5252

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00