Method for producing surrounding gate semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9842902
APP PUB NO 20170338320A1
SERIAL NO

15672549

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An SGT is produced by forming a first insulating film around a fin-shaped semiconductor layer, forming a pillar-shaped semiconductor layer in an upper portion of the fin-shaped layer, forming a second insulating film, a polysilicon gate electrode covering the second insulating film, and a polysilicon gate line, forming a diffusion layer in an upper portion of the fin-shaped layer and a lower portion of the pillar-shaped layer, forming a metal-semiconductor compound in an upper portion of the diffusion layer in the fin-shaped layer, depositing an interlayer insulating film, exposing and etching the polysilicon gate electrode and gate line, depositing a first metal, forming a metal gate electrode and a metal gate line, and forming a third metal sidewall on an upper side wall of the pillar-shaped layer. The third metal sidewall is connected to an upper surface of the pillar-shaped layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNISANTIS ELECTRONICS SINGAPORE PTE LTDSINGAPORE 179098

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masuoka, Fujio Tokyo, JP 412 6771
Nakamura, Hiroki Tokyo, JP 382 4527

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00