Quantum efficiency (QE) restricted infrared focal plane arrays

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9842868
SERIAL NO

15016015

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sensor includes an InGaAs photodetector configured to convert received infrared radiation into electrical signals. A notch filter is operatively connected to the InGaAs photodetector to block detection of wavelengths within at least one predetermined band. An imaging camera system includes an InGaAs photodetector configured to convert received infrared radiation into electrical signals, the InGaAs photodetector including an array of photodetector pixels each configured to convert infrared radiation into electrical signals for imaging. At least one optical element is optically coupled to the InGaAs photodetector to focus an image on the array. A notch filter is operatively connected to the InGaAs photodetector to block detection of wavelengths within at least one predetermined band. A ROIC is operatively connected to the array to condition electrical signals from the array for imaging.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SENSORS UNLIMITED INCPRINCETON NJ 08540

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rozploch, Robert Newtown, US 15 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00