Method of producing a semiconductor package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9842792
SERIAL NO

15007607

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a lead frame includes providing an electrically conductive layer having a plurality of holes at a top surface. The plurality of holes form a structure of leads and a die pad on the electrically conductive layer. The plurality of holes are filled with a non-conductive material. Next; an electrically conductive foil is attached on the top surface of the electrically conductive layer and the non-conductive epoxy material. The, the electrically conductive foil is etched to create a network of leads, die pad, bus lines, dam bars and tie lines, wherein the bus lines connect the leads to the dam bar, the dam bar is connected to the tie line and the tie line is connected to the die pad.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UTAC HEADQUARTERS PTE LTD22 ANG MO KIO INDUSTRIAL PARK 2 SINGAPORE 569506

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheong, Mary Annie Singapore, SG 4 30
Retuta, Danny Singapore, SG 4 37
Sun, Anthony Yi Sheng Singapore, SG 18 148
Tan, Hien Boon Singapore, SG 23 501

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00